Preparation of the construction site

Site Provision

At this stage, Pyramis specialists prepare the construction site for the active phase of work, ensuring everything is organized and accessible for the construction process.

Temporary necessary utility systems are set up — electricity, water, and, if needed, temporary sewage — to provide comfortable working conditions on-site.

Temporary fencing is installed, materials are stored and organized, and temporary facilities for personnel are provided.

Measures are taken to ensure safety regulations are followed to minimize risks on the site, including the marking of work zones and the installation of warning signs.

Earthworks

Earthworks play a crucial role in the initial preparation of the construction site.

Before the main construction begins, the site is cleared of trees, stones, and other obstacles, and leveled according to the project plan.

Depending on the project, foundations are excavated, and trenches for utility networks are dug, providing the base for further construction.

If necessary, soil stabilization or replacement of its layers is carried out to ensure the foundation's stability and extend the lifespan of the future building.

WE THINK AHEAD

We don’t just design engineering systems.
We create life infrastructure that works seamlessly, delivering maximum comfort, stability, and control. If you're looking for solutions that will remain relevant not only today but also in the future — let’s talk about your project.